SOLUTION 02 · POWER & LIGHTING

Off-Grid Power & Site Lighting Solutions

Remote projects start with no grid. We integrate diesel generator sets and mobile light towers — quality-controlled and matched to your load — so work continues after dark and the crew accommodation has reliable electricity from the first day, worldwide.

Power the site from the first day

Generator capacity is calculated from the real load — accommodation HVAC, lighting, kitchen and office equipment, plus site tools and starting currents — with a safety margin. Light-tower coverage is planned against work areas, access roads and the perimeter for the required illumination.
Power and lighting are integrated and quality-controlled by Sinoreal and configured for local frequency, voltage and climate, then matched to the container houses they will run.

What this covers

  • ✓Prime & standby power
  • ✓Open, silent & trailerized generators
  • ✓Diesel or solar mobile light towers
  • ✓50 / 60 Hz and local voltage
  • ✓Load matching, cabling & switchgear
  • ✓Night work & perimeter lighting
EQUIPMENT FOR THIS STAGE

Reliable power and light, wherever the site is

Integrated and quality-controlled equipment, sized as one system with the site it powers.

[ Photo placeholder · diesel generator sets ]

Integrated & Quality-Controlled

Diesel Generator Sets

Open, silent and trailerized generator sets for prime and standby power, configured for local frequency, voltage and climate and sized to the full site load.

[ Photo placeholder · mobile light towers ]

Integrated & Quality-Controlled

Mobile Light Towers

Diesel or solar mobile light towers for safe night work, access roads and perimeter security, with coverage planned to the work area.

[ Next stage · site accommodation ]

Complete the Project

What does this power?

The same generator sets power the container housing — rooms, kitchen, offices and communications — while light towers extend the working day.
HOW IT IS SIZED

From load list to a powered, lit site

Power and lighting are engineered around your actual consumption, not guessed.

1

Load calculation

List site and equipment loads, including starting currents, and add a safety margin.

2

Generator selection

Choose kVA, open/silent/trailer configuration and fuel arrangement.

3

Lighting plan

Map work areas, roads and perimeter to tower positions and illumination levels.

4

Cabling & switchgear

Supply matched cabling, distribution and switchgear for safe connection.

5

Commissioned together

Generators, lighting and site are commissioned as one system.
WHERE IT IS USED

Industries This Solution Serves

The same stage, configured to the standards and conditions of each sector.
COMPLETE THE PROJECT

Power brings the site to life — and follows the earthworks

Power arrives after the land is prepared and directly enables the crew accommodation and night work. Take it on its own or as part of the sequenced package.

Solutions FAQ

Frequently Asked Questions

Practical answers on equipment selection, sizing, packaging, shipping and support.

We total the accommodation and equipment loads, account for motor starting currents and simultaneity, and apply a safety margin. Sending your equipment and crew list is the fastest way to an accurate size.

Yes. Sets are configured for 50 Hz or 60 Hz and the voltage used in your country, with alternators and controls to suit.

Diesel towers give long runtime independent of weather; solar towers suit sunny, fuel-constrained or low-noise sites. We recommend a mix where it makes sense.

Yes. Silent-canopy sets suit noise-sensitive accommodation units and offices, while trailer-mounted generators and light towers move easily along linear sites.

Yes — that is exactly how the package is designed. The site load is included in the generator sizing, so power and housing are matched.

Warranty parts are delivered by air when needed and our engineers provide remote video commissioning and troubleshooting.

More questions? See the FAQ or contact our engineers.

Size your site power and lighting

Share your crew size, equipment list and required illumination — we will calculate the generator and lighting configuration.